Arzobispo Loayza Hospital projects: modernization works for 2026

by worldysnews
0 comment

The expansion of the hospital will be in the eastern area and will not interrupt care

He general director of Archbishop Loayza National HospitalCarlos Otiniano Alvaradoannounced that the hospital modernization works, as part of the Centennial Hospitals Plancould be completed by 2026 if the contract modality is used Government to Government.

Otiniano Alvarado assured that this method ensures transparency and minimizes the risks of corruption during the execution of the works.

Read also:

San Miguel: One security agent dead and two arrested

In an interview with local media, the general director explained that the pre-investment stage has already been completed and the feasibility of the project has been evaluated, ensuring that meets profitability criteria social and sustainability.

Furthermore, the design of the contingency plan guarantees medical care during the construction of the new infrastructure.

Arzobispo Loayza Hospital will integrate modern infrastructure

The project includes the construction of a modern infrastructure hospitable at the east end of the current land, distributed over five levels and four basements. Likewise, the new infrastructure will have 1,094 beds, including hospitalization, intensive care units, emergency areas and surgical recovery.

Otiniano Alvarado emphasized that the design of the new hospital will not affect the old part of the buildingbuilt in 1924, so patients will continue to be treated in the offices located in that area. In addition, new temporary spaces will be adapted to guarantee the continuity of services during construction.

«These criteria support its declaration of viability, an essential requirement to begin its execution. The pre-investment phase involves an architectural design and a study of the equipment needed, according to demand and supply. What we have also done is include the contingency plan that will allow us to organize care in the outpatient clinics during the time that the modern part of our hospital is going to be built.assured Otiniano.


#Arzobispo #Loayza #Hospital #projects #modernization #works
2024-04-26 11:15:36

You may also like

Leave a Comment

Hosted by Byohosting – Most Recommended Web Hosting – for complains, abuse, advertising contact: o f f i c e @byohosting.com