Energy intake necessities were showed – 2024-09-29 18:37:25

The Board of the Ministry of Power authorized “Technical necessities associated with the intake of electrical energy”.

Publika.az studies that Minister Parviz Shahbazov signed a brand new determination on this regard.

Consistent with the verdict, relying at the community to which the development object is hooked up, electric installations should be provided with an electrical meter in step with their technical parameters for agreement between the operator of the transmission or distribution machine and the shopper for electrical energy intake.

As well as, the electrical meter put in for the shopper should be put in on the border of the steadiness belongings, on the border (front) of the plot of land the place the development object is situated, on the ends of the feeder cable, relying at the community to which the development object is hooked up, the place the operator of the transmission or distribution machine could have an unobstructed view.

Relying at the community to which the development object is hooked up, the seal of the transmission or distribution machine operator shall be positioned at the duvet of the clamp socket (field) of the electrical meter put in for the shopper, at the transmissions of the disconnectors of the present and voltage transformers that feed it, in addition to at the meeting clamps of the wires hooked up to the meter.

The verdict will input into power on July 1, 2025.

The Felony Division of the Ministry was once prompt to post this determination to the Ministry of Justice for inclusion within the State Sign up of Felony Acts inside 3 days.

READ Also:  The 23-hour anti-terrorist operation is the restoration of justice and history -


#Energy #intake #necessities #showed

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.