ACC has raided the Directorate of Public Well being Engineering and Well being Engineering in Gopalganj. The company has discovered many irregularities within the operation.
ACC Gopalganj District Administrative center Deputy Director Moshiur Rahman performed the operation on Monday (January 20) afternoon.
He stated that water strains and sewage drainage were built at Savanna Eco Lodge and Herbal Park of former IGP Benazir Ahmed via spending a number of lakhs of rupees. Except for this, there were lawsuits of irregularities within the distribution of tubewells and latrines, building of public bogs, provide of water strains in quite a lot of villages. There are allegations that the federal government is charging a number of occasions greater than the fastened value for the distribution of tubewells. We now have performed an operation within the Directorate of Public Well being and Engineering of the district on such lawsuits. The entire allegations had been discovered to be true all the way through the operation.
He additionally stated that the development of a 20-bed clinic was once began in Nizamkandi Union of Kashiani Upazila in 2019 with out the information of the civil surgeon of the district, however even part of the paintings was once now not finished. Then again, the invoice of Tk 16 crore 19 lakh has been paid for this challenge. Even though the time has been prolonged 3 times, the challenge’s contractor and engineer are expanding the price with out finishing the paintings in coordination with each and every different. It has led to large monetary loss to the federal government. Criminal motion will probably be taken at the side of investigation on this regard.
Ashiq Zaman AB/AH/ASM
#ACC #irregularities #Directorate #Public #Well being #Engineering